House and infrastructure building projects are currently in progress under the auspices of the "Star" organization
In the heart of Yakutsk's Star district, development is underway in Sector S. Here's a roundup of the latest updates on the construction of residential buildings, road infrastructure, and educational facilities.
Asphalt paving is set to begin soon, marking the final stage of arranging the road infrastructure in Sector S. Work on the street road network is progressing, with LLC "Dorstroy" responsible for the arrangement of the street road network. The company has already installed the base for the road surface and curb stones for pedestrian sidewalks.
Three buildings, using frame-monolithic design, are currently under construction in Sector S. One of these buildings, utilising prefabricated reinforced concrete structures, is already 60% complete, and the completion of the remaining two is scheduled for next year. Construction of another three buildings using similar prefabricated structures has recently started on an adjacent site.
The school in Sector S, designed to accommodate 990 students, is scheduled for handover in June 2026. The complex of works for the school includes internal and external finishing, landscaping, and installation of sports and children's equipment.
Commercial premises in the completed houses in Sector S are being actively filled by entrepreneurs. tea and coffee shops, as well as a branch of a network bakery, will start operating in the area soon. Pick-up points of well-known marketplaces and a grocery store have recently opened, further enhancing the neighbourhood's amenities.
Edvardas Mikalaunas heads the capital construction department of SZ "RIA", overseeing the active construction of multi-family residential buildings in Sector S. The capital construction department of SZ "RIA" has reported that construction in Sector S is progressing as planned.
For the most accurate and current updates on residential development, educational facilities construction, and road infrastructure planning in Sector S, it may be necessary to consult local Yakutsk municipal government sources, urban planning departments, or recent regional development reports directly.
- In addition to the ongoing residential development, investments are being made in commercial real estate within Sector S, with tea and coffee shops, a network bakery branch, and marketplace pick-up points already operating.
- The construction of the school in Sector S, expected to house 990 students, is scheduled for completion in June 2026, including internal and external finishing, landscaping, and installation of sports and children's equipment.
- Home-and-garden enthusiasts may find interest in the upcoming housing-market developments, as the construction of several new buildings using prefabricated structures is underway in Sector S, with a reported completion timeline for next year.